The list of everything the software must do. Requirements are typically organized within each Functional Area and categorized by transaction, report, or routine/process. When gathering requirements, it is best to document everything requested and categorize each request as either:

  • Required for go-live: Go live cannot happen unless the requirement is met.

  • Required within 60 days of go-live: The system can go live but the requirement must be met within 60 days.

  • Important: The requirement is important enough to partner with NLP in adding it to the system.

  • Nice to Have: A suggestion that should be considered for a future release.